CASE STUDY 1 - UNIVERSITA DEL SALENTO

Office Building, Campus, Ecoteckne, Lecce, Italy

Single air-to-water rooftop heat pump serving academic and office areas throughout building. Maxwell™ added to fluid loop (water & glycol) increased heat transfer from the refrigerant to the fluid during the Heat Pump heating cycle. Increased heat transfer occurs at the zone fan coil and outdoor air ventilation units, allowing thermostats to reach setpoints more quickly

Regeneron_Logo
CASE STUDY 2 - REGENERON

Building 2 and Building 4, US Corporate HQ Campus

• Energy Recovery Units in 2 research buildings
• Air Handling Units provides 100% outside air to laboratories,
operating 24/7/365
• Maxwell™ added to runaround loop (water & glycol) to increase heat transfer at recovery coils in Exhaust Fans and Air Handling Units

Aramco_Logo
CASE STUDY 3 - ARAMCO

Building 1900, Corporate Campus, Dharan, Saudi Arabia

• Multi-purpose office building on main campus
• Twin Carrier Air-Cooled Chillers serve individual fan coil units throughout building
• Maxwell™ added to main chilled water loop to increase heat transfer in chiller evaporators and at individual fan coils.